Messy Job Finished

 Posted by at 12:30 am  Nick's Blog
Feb 202024
 

In Saturday’s blog I told you how the subcontractor doing the trenching for the gas lines for our new whole house generator had cut two of the field lines for our septic system the day before. I called Scott and Alan Banks from Banks Construction to come out to see about repairing them, but we […]

What A Mess

 Posted by at 12:35 am  Nick's Blog
Feb 182024
 

Things were going along smoothly with our Generac whole house generator installation on Thursday. The generator was set on its pad, the new breaker box with the automatic transfer switch was mounted on the side of the house and all the wiring was in place, and things were looking good. Then the excrement hit the […]

Generator Delivery

 Posted by at 1:09 am  Nick's Blog
Feb 172024
 

I was up and out of bed a little after 6:30 yesterday morning, believe it or not. If it would have been a normal morning, I would have peed and gone back to sleep. But this wasn’t a normal morning, because this was the day our Generac 24 KW whole house generator was being delivered. […]